Bridges · Project Example

Rethe bascule bridge

City Hamburg
Country Germany
Client Freie Hansestadt Hamburg
Client   Hamburg Port Authority
Construction period 2011 - 2016

As the leader of a joint venture HOCHTIEF is realizing the new construction of the Rethe bascule bridge in Hamburg. As the main road connection of the inner harbor area to the South, the bridge is one of the most important infrastructure projects in the harbor of the Hanseatic city. The old lifting bridge, which dates from 1934, had become outdated and was no longer capable of coping with increasing traffic volumes. The new bridge’s folding technology will allow a better flow of shipping as well as road and rail traffic in the future. Also local companies that handle goods for the bulk material ships can then also be more easily reached thanks to the then unlimited clearance height and the wider horizontal clearance of the bridge.

The double-section, two-wing bascule bridge made of steel has a span of 104.2 meters between the pivot bearings, making it one of Europe’s largest bascule bridges. Its railway bridge is the biggest of its kind in Europe.

The walls of the construction pit were already built in an environmentally compatible drilling process from the water. During this process we maintained the ongoing traffic on the road, rail and in the water. The Rethe bascule bridge was built parallel to the existing old bridge, which will be dismantled after construction work on the new bridge is finished. Apart from refurbishment and upgrading and construction work during ongoing operations, the particular challenges included the narrow spaces involved, working in a tidal zone and the seasonal guarantee of flood protection.

The new Rethe bridge, including the connecting roads and railways on both sides, will be handed over as a turnkey facility to Hamburg Port Authority (HPA). It will then span a 64 meter wide shipping channel and have a total of four lanes for road traffic and one line for rail traffic. According to current plans, in future more than 7,000 trucks and passenger cars will pass through this transport hub in Hamburg Harbor every day. Furthermore, 30 goods trains and approximately 40 ships pass through daily.

Copyright © Sky View Imaging

HOCHTIEF Infrastructure GmbH
Deutschland Nord
Fuhlsbüttler Straße 399
22309 Hamburg • Germany
Tel: +49 40 300 321 5560
Fax.: +49 40 300 321-5561
infra-dnord@hochtief.de
www.hochtief-infrastructure.de

 

other projects in segment Bridges
Highway A4

Highway A4 • Germany

Queensferry Crossing

Queensferry Crossing • Edinburgh• United Kingdom

Saale-Elster Viaduct

Saale-Elster Viaduct • Germany