Engineering
Planning Projects
  • HOCHTIEF Solutions
  • ·

HOCHTIEF Engineering GmbH · Project Example

Swinoujscie breakwater

City ?winouj?cie
Country Poland

Swinoujscie, Poland, is the site of an LNG terminal which is to be protected by a new breakwater. HOCHTIEF Solutions pooled its specialist and regional skills to build this breakwater with an integrated quay wall. Besides execution of piling works and equipping the facility, our solution included construction planning for the 3,000-meter-long maritime structure. The construction of a fairway 1,800 meters in length and a turning basin for the LNG vessels means smooth sailing into a safe port.

Copyright © FOT.4DFoto

HOCHTIEF Polska SA
ul. Elblaska 14
01-737 Warschau • Polen
Tel: +48 22 5600800
Fax.: +48 22 6339786
info@hochtief.pl
www.hochtief.pl

HOCHTIEF Engineering GmbH
Consult Infrastructure
Alfredstraße 236
45133 Essen • Deutschland
Tel: +49 201 824-2741
Fax.: +49 201 824-2742

www.hochtief-engineering.de

 

ähnliche Projekte von HOCHTIEF Engineering GmbH
Burchard Quay

Burchard Quay • Hamburg• Germany

U 4 HafenCity

U 4 HafenCity • Hamburg• Germany

Thames Tunnel

Thames Tunnel • London• United Kingdom