HOCHTIEF Engineering GmbH · Project Example

Epping to Chatswood Rail Line

Country Australia
Client Transport Infrastructure Development Corporation
Contract type Design & Construction
Length 12.5 kilometers

Between 2002 and 2008, HOCHTIEF and CIMIC subsidiary Thiess worked in a joint venture to build two tunnels each 13 kilometers long as well as four railway stations north of Sydney. The contract was part of the Parramatta Rail Link, at the time the largest publiclyfunded infrastructure project in Australia. In addition to the tunnel work, the joint venture was also responsible for designing,
building, and commissioning the track, signal, and communications systems.

More about CIMIC railway projects

Copyright © Thiess

Thiess Pty Ltd.
Level 5 179 Grey Street
QLD 4101 South Bank • Australien
Tel: +61 7 30029000
Fax.: +61 7 30029689

www.thiess.com.au

HOCHTIEF Engineering GmbH
Consult Infrastructure
Alfredstraße 236
45133 Essen • Deutschland
Tel: +49 201 824-2741
Fax.: +49 201 824-2742

www.hochtief-engineering.de

 

ähnliche Projekte von HOCHTIEF Engineering GmbH
Swinoujscie breakwater

Swinoujscie breakwater • ?winouj?cie• Poland

Burchard Quay

Burchard Quay • Hamburg• Germany

Gotthard Base Tunnel

Gotthard Base Tunnel • Suisse