Infrastructure
Infrastructure Projects
  • HOCHTIEF Solutions
  • ·

HOCHTIEF Building · Project Example

Cheves hydroelectric power station

Country Peru
Completion 2013

The Cheves hydroelectric power station is being built in the Peruvian Andes at a height of 2,000 meters. In addition to the underground power plant, the HOCHTIEF Solutions contract includes building 17 kilometers of tunnel, two weirs, and a dam. The 168-megawatt plant is designed to generate enough energy to cover the maximum requirements in the Lima area after handover in late 2013.

Copyright © Oscar Durand

HOCHTIEF Solutions AG Sucursal del Perú
Av. Camino Real 390, Of. 801
San Isidro, Lima • Peru
Tel: +511 208 8100
Fax.:
handersson@cch.com.pl
http://www.hochtief-solutions.de

HOCHTIEF Engineering GmbH
Consult Infrastructure
Alfredstraße 236
45133 Essen • Deutschland
Tel: +49 201 824-2741
Fax.: +49 201 824-2742

www.hochtief-engineering.de